SR-125 Toll Road
City of Chula Vista

The new 9.5 mile toll road connects the Otay Mesa international cargo crossing with the inland freeway system and facilitates trade and land development.

SR-125 Toll Road
Construction Design

FPL started design in 2003 and provided construction design changes and construction support until the road opened in October 2007.

SR-125 Toll Road
PS&E

FPL prepared PS&E for pavement delineation, signage, traffic signals, highway/bridge lighting and sign illumination, local street signing, local street lighting, traffic handling and the installation of a new FOE system, including fiber optics cable, CCTV, CMS, traffic monitoring station.

SR-125 Toll Road
Traffic Management Plans

FPL also prepared Traffic Management Plans (TMP) for the entire corridor. One major change that took place during the project was the change in Caltrans design standards from the 1999 version to the 2004 version.